OHPC Hydro Power Dam

The Rengali masonry-cum-concrete dam, 1,040 M long has been divided into 51 blocks for construction purposes. Of these, 24 blocks in the centre are spillway blocks provided with radial gates and a spillway bridge. There are 8 non-overflow blocks in the right flank and 19 in the left. Blocks 10 to 14 from the left are power dam blocks through which penstock pipes of 6 meter dia are embedded. The power house is located just downstream of the Power Dam. This dam connecting two hill ranges on either side along with a 4.6 M high dyke near village Khindo forms the reservoir of 414 Sq. Km at M.W.L. of 125.4 M.

The power house accommodates the service bay and 5 unit bays for installation of 50 MW capacity generators in each unit.

For power generation axial flow kaplan turbines with 8 blades having runners of 4.5 M dia rotating at a speed of 166.7 RPM at the designed head of 40 M to produce a rated output of 50 MW are provided.

The construction of main dam had been completed in 1985.

For utilising the water discharge of power house for irrigation purpose, a barrage with 2 canals is under construction at Samal, located about 45 Km downstream of Rengali Dam.

Benefits

  • Area protected form flood 2,600 Sq.Km
  • Population benefited 10.8 Lakh
  • Irrigation 2.70 Lakh Hectares

ଅଭିଗମ୍ୟତା ସମନ୍ୱୟ

ବିଷୟବସ୍ତୁ ସମନ୍ୱୟ

ଫଣ୍ଟ ଆକାର କମାନ୍ତୁ
ପୂର୍ବନିର୍ଦ୍ଧାରିତ ଫଣ୍ଟ ଆକାର
ଫଣ୍ଟ ଆକାର ବଢ଼ାନ୍ତୁ
ଶିରୋନାମାକୁ ହାଇଲାଇଟ୍ କରନ୍ତୁ
ଟେକ୍ସଟ୍ ବଡ଼ କରିବା ଉପକରଣ

ବର୍ଣ୍ଣ ସମନ୍ୱୟ

ହାଲୁକା କନ୍ଟ୍ରାଷ୍ଟ ଥିମ୍
ଗାଢ଼ କନ୍ଟ୍ରାଷ୍ଟ ଥିମ୍
ଉଚ୍ଚ କନ୍ଟ୍ରାଷ୍ଟ
ଏକରଙ୍ଗୀୟ
ଟେକ୍ସଟ୍ ରଙ୍ଗ ସମନ୍ୱୟ କରନ୍ତୁ
ଉଚ୍ଚ ସାଚୁରେସନ୍
ଶିରୋନାମାର ରଙ୍ଗ ସମନ୍ୱୟ କରନ୍ତୁ

ଅଭିମୁଖ ସମନ୍ୱୟ

ଛବିଗୁଡିକୁ ଲୁଚାନ୍ତୁ
ହୋଭର୍ କୁ ଉଦ୍ଧାର କରନ୍ତୁ
ବଡ଼ କଳା କର୍ସର୍
ବଡ଼ ସଫେଦ କର୍ସର୍